Back

ASIAN HOSPITAL AND MEDICAL CENTER

Location :  Filinvest Corporate City, Alabang
Project Brief : Installation of air-conditioning equipment including the three (3) units 500TR water chillers, three (3) units 76 lps end-suction chilled water pump, three (3) unit 95 lps end suction condenser water pump, three (3) units 2-cell induced draft cooling tower, twenty-five (25) air handling units of various capacity, two hundred seventeen (217) fan coil units of various capacity. Supply and installation of two (2) units heat pump, four (4 ) hot water storage tanks and hot water piping. Installation of ventilation supply and exhaust fans. Supply and installation of ten (10) units electric duct heater and controls. Supply and installation of one (1) unit each of Air Separator and Expansion Tanks including piping works and accessories. Supply and installation of chilled and condenser water piping, refrigerant piping. air-conditioning, kitchen exhaust, stairwell pressurization, smoke exhaust and ventilating ductwork, testing, balancing, and commissioning of the mechanical system.